Digital reality

Geomatics and surveying
for mining and infrastructure projects

Who we work for

We work for the mine areas that need to know their infrastructure precisely (Projects, Water and Tailings, Environment and Hydrology) and for the engineering and construction companies working around the operation: plant expansions, crushing, conveying and ports. For them, we measure inside a mine that never stops, with its permits, its contractors and its legacy coordinate systems.

Las Bambas
Hochschild Mining
Nexa Resources
Antamina
Barrick
Minsur
Marcobre
Zafranal
Chinalco
Glencore
El Brocal
Pan American Silver
Boroo
Cerro de Pasco Resources
WSP
Ausenco
AtkinsRéalis
APM Terminals
Las Bambas
Hochschild Mining
Nexa Resources
Antamina
Barrick
Minsur
Marcobre
Zafranal
Chinalco
Glencore
El Brocal
Pan American Silver
Boroo
Cerro de Pasco Resources
WSP
Ausenco
AtkinsRéalis
APM Terminals
Las Bambas
Hochschild Mining
Nexa Resources
Antamina
Barrick
Minsur
Marcobre
Zafranal
Chinalco
Glencore
El Brocal
Pan American Silver
Boroo
Cerro de Pasco Resources
WSP
Ausenco
AtkinsRéalis
APM Terminals

Operational
standard

We do not work on assumptions. Before each task we reassess the risks at the work point, and every deliverable goes through a GNSS base, check points and validation before it leaves our office. Our management systems are certified to ISO 9001:2015 (quality) and ISO 45001:2018 (occupational health and safety).


MANAGEMENT SYSTEMS CERTIFIED TO ISO 9001 AND ISO 45001
AENOR ISO 9001 seal - Quality management AENOR ISO 45001 seal - Occupational health and safety
28YEARS OF
EXPERIENCE
+920KMAN-HOURS WORKED
IN THE LAST 10 YEARS
0ACCIDENTS
+2800PROJECTS EXECUTED
IN 5 COUNTRIES
CERTIFICATE VIEWER

A case in point

At an operation located above 4,000 m a.s.l., we carried out the cartographic and topographic inventory of two process plants, one old and one modern: 65 hectares of infrastructure. With more than two survey crews, 21 days in the field and 14 in the office, we handled access to the operation, coordination with on-site contractors and the requirements of working inside running plants. The engineering company in charge received the information within the planned schedule, as the basis for its new expansion projects.

65 haof infrastructure
+4,000m a.s.l.
21 + 14field and office days
● 2026 VISION

Beyond
the data.

A mining expansion is designed on what exists today. For 28 years, at T&S we have made sure that baseline is reliable: measured in the field, validated in the office and delivered on the committed date.


REC